Edges of water

If a shore or bank must be reinforced with surface treatment to resist erosion (stone riprap, reinforced concrete wall), adequate allowance must be factored for the highest expected water level and maximum wave action. What does this refer to?

AnswerFreeboard: the distance from the normal water line to the top of the reinforced or treated surface, which is considered a factor of safety (feet) above a flood level, important for floodplain management.

Resource note: See this link to FEMA for an index of site-related terms & keywords

ARE 4.0 exam prep: SPD

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP