Skip to main content

Finish ARE 4.0 before ARE 5.0 gets here!


When should you plan to complete ARE 4.0? See answer.


Almost out of time - 6/30/18 ARE 4.0 exam series is retired and you will need to complete ARE 5.0 instead.

Comments

Try These Too!

Building Efficiency

Convert the usable area of classrooms planned with medium efficiency level of new construction to the gross building area given the following model factors: Net Assignable Square Feet: 10,000, Space Factor: 1.5, Building Efficiency Ratio: 67%

Shoring

A slurry wall is a narrow trench filled with a slurry mixture composed of bentonite clay and water, enabling it to resist pressure from the surrounding earth. What type temporary support is this? A. Bracing B. Sheeting C. Underpinning Answer B. It is a type of sheeting. ARE 4.0 exam prep: SPD

Floor receptacles

To qualify as one of the required power receptacles in a dwelling, according to NEC, what is the maximum distance from the wall that this recessed or surface-mounted floor receptacle close to an exterior wall may be? Answer Less than or equal to 18 inches. Additional requirements apply, such as approved floor box housing, cover... ARE 4.0 exam prep: BS