Construction and Evaluation exam reference materials:



Although the latest CSI MasterFormat is now far beyond the NCARB recommended 2004 edition for the exam series, it's worth checking out this in depth discussion: What is MasterFormat 2004 and Why Should I Care?

AIA Contract Document Comparisons Series compares current and previous versions of AIA documents either side-by-side or strikeout/underline

Contract Docs: AIA Document A201™–2007, General Conditions of Contract for Construction.
AIA Document B101™–2007, Owner/Architect Agreement.

AIA A201-2007 Commentary PDF free
AIA Contract Relationship Diagrams

Professional Practice Lecture Notes and Audio by Prof. Hanahan, Chicago-based construction lawyer (covers contracts well)

If you know of other useful links, please share!

Disclosure  Policy

Comments

Try These Too!

Fire detection

Which of the following detector types can detect smoke or a smoldering fire that has not yet burst into flames? A. Ionization B. Rise-of-temperature C. Photoelectric D. Flame detectors

Risk management

How does an owner provide a financial safeguard for the following situations: - unanticipated price escalation of a particular product - an architect’s omission of flashing in the construction documents - a necessary change during construction, modifying the project’s scope. A. Allowance B. Alternates C. Contingency D. Escalation Answer C. Contingency is an amount, usually a percentage, that is part of the project budget to offset changes in the scope of the project, unknown conditions, and gaps/oversights in the documents. ARE 4.0 exam prep: PPP