Pipe joining methods

The process of joining two pieces of piping that requires the material to be heated occurs with which of the following? A. plastic B. copper C. iron D. steel Answer B. copper is soldered and the material heated. Other methods also exist to join copper such as quick connect fittings. Plastic (A) is joined by solvent welding. Steel (D) or iron (C) piping is usually threaded and joined with couplings and fittings. ARE 4.0 exam prep: BS

Estimating guidelines: column load

Assuming an effective length of 12 feet, which of the following would support 850 sf of floor and roof area? A. 4x4 steel tube column B. 6x6 wood column C. 8x8 wood column D. 6x6 steel tube column E. W6x6 steel (wide-flange) Answer C. (can support up to 1000sf) and D. (can support up to 2400sf). A. and E. can only support upto 750sf. ARE 4.0 exam prep: SS

Tax types

What is the basis for an ad valorem tax? Answer This is the value of the property being taxed. ARE 4.0 exam prep: PPP

Retention pond

What is the period of time that a retention pond is intended to hold a specific amount of water? A. 3 days B. 5 days C. drawdown period calculation required D. indefinite Answer D. indefinite. By contrast, a detention pond is a temporary holding area, controlling flooding until the water slowly drains to another location. ARE 4.0 exam prep: SPD